Essential details
Shipping:Ocean freight
Product Introduction
Purpose:
It is used to connect the water pipe between the condenser and the cooling tower in the air conditioner.
Cooling water pipe installation:
Oil and air cold water pipe installation:
Stop valves, thermometers and pressure gauges should be installed on the inlet and outlet pipes. Down in, up out.
Set up a drain so that water can be removed in winter.
Install filter after inlet pipe stop valve.
When installing, pay attention to the convenience of removing the cooler when cleaning the radiator in the future.
Treated soft water should be used.
Before formal use, close the valve and flush the pipeline;
If the valve is not closed, welding slag and other debris in the pipeline will enter the clogging cooler.
The oil cooling and air cooling pipes are installed in such a way that the cooler cannot be drawn out.
No temperature, pressure gauge.
The above content is organized by Jiangsu stainless steel pipe manufacturers, welcome to inquire!